Sales & Support: Request A Quote
Home ProductsPurlin Roll Forming Machine

7.5kw Galvanized Material Scaffold Board Purlin Roll Forming Machine

7.5kw Galvanized Material Scaffold Board Purlin Roll Forming Machine

7.5kw Galvanized Material Scaffold Board Purlin Roll Forming Machine
7.5kw Galvanized Material Scaffold Board Purlin Roll Forming Machine
7.5kw Galvanized Material Scaffold Board Purlin Roll Forming Machine
Product Details:
Place of Origin: CHINA
Certification: CE
Payment & Shipping Terms:
Minimum Order Quantity: 1
Price: Negotiate
Packaging Details: main machine package with film and the plc and part package with plastic
Delivery Time: 40 days
Payment Terms: T/T
Supply Ability: 99
Contact Now
Detailed Product Description
Name: Scafford Borad Roll Forming Machine Material: Galvanized ,zin
Roller Steps: 20 Steps Material Thickness: 0.8-2mm
Power: 7.5kw Warranty: 24 Months
High Light:

board purlin roll forming machine

,

scafford purlin roll forming machine

,

7.5kw Purlin Roll Forming Machine

Scafford Board Roll Forming Machine Use Gaslvanized Material

 

scafford board roll forming machine use for producting the scafford board , scafford board use for makeing the steel building .

it is do as stair steps .such as for the mobile home ,steel building ,light steel villa or cottage.the machine can be product 


by the speed of 12-15 meters/min.

Profile


7.5kw Galvanized Material Scaffold Board Purlin Roll Forming Machine 0
Specification

No. item  
1 Machine use product scafford board 
2 Material coil Galvalume ,galvanized, aluminum,PPGI,colour steel
3 Coil thickness 0.8mm-1.0mm
4 Machine dimention(L*W*H) 15000mm*1000mm*1500mm
5 Voltage 240v/380v/415v ( can be do s yours)
6 Roller steps 20 steps
7 Roller material ball bearing steels
8 Working speed 15-20 meter/min
9 Product capacity 1.5-2.5 tons/hour
10 Machine weight 5500KG
11 Control system Panasonic PLC or siemens plc ( can be cutomized)
12 Drive motor power 7.5kw
13 Cutting mode Automatic Hydraulic cutting
14 Cutting accuracy ±1mm
15 Control computer language English (can be customized )
16 Shaft diameter 70mm
17 lifetime 10-12 years
18 warranty 24 months
19 Loading and shipping Loading by container ,shipping by vessel


The product line working process:

7.5kw Galvanized Material Scaffold Board Purlin Roll Forming Machine 17.5kw Galvanized Material Scaffold Board Purlin Roll Forming Machine 27.5kw Galvanized Material Scaffold Board Purlin Roll Forming Machine 37.5kw Galvanized Material Scaffold Board Purlin Roll Forming Machine 4Decoiler -feeding -roll forming- cutting -received

 

 

Components and Technical Specificatons

(1) Manual decoiler It is used to support the steel coil and make the coil run to rotatory to realized the material sending. The decolier will be rotatory with the main roll forming machine. The capacity of this decoiler is 4000kg, the decoiler can support 508mm inner bore.

(2) Main roll forming machine The main roll forming machine is the most importent process for producting roof sheet .Our rollers adopt 45# steel ,the rollers will be polishing after lathe.Then need to electroplate so make the rollers more lustre and smooth.

7.5kw Galvanized Material Scaffold Board Purlin Roll Forming Machine 5

(3) Feeding table Put People can put the raw material through the feeding table then go inside the roller to manufactuer and process.the feeding table can guarantee the material run in line and protect it from scratch.

(4) Hydraulic cutting system and cutting moulding
The hydraulic station power is 4kw ,hydraulic oil is 46# , cutting moulding is Cr12.

(5) Control computer box The The computer can make the machine working as your target pieces and length. All data can be adjusted by digit of it. The transducer of the computer can adjust the product speed and also can keep the caccuracy less than 1mm.

(6) Out table This part be welded by angle steel bar and square tube,it have the function of transport or support the products .It can collect products after finished working.

(7) Machine package and loading Main roll forming machine will be nude, the electric part or spare parts will be cover by film or be package by wood box,Common the machine need loading 20 GP or 40 GP container according to its volume.

Warranty&service

1. we provide 24 months’ guarantee . the guarantee against malfunctions duo to the manufactuering defeats or quality problem.
2. Repairs will not be performed even during the guarantee period in the follow conditions

- Damage occurs due to a natural disaster

- Malfunction occurs due to user error

- Malfunction occurs due to modifications

- Malfunction occurs due to further movement or shipment after installation

 

Payment terms

40% advance payment by T/T
60% balance be paid before shipping T/T
Delivery

We can do FOB &CIF price

FOB form Tianjin port

CIF to destination port

The delivery time :

25-35 days after we receive your advance payment.
Shipping time:

If everything goes well, common the shipping time is 30-50 days, but different destination different transport time

 

 

Contact Details
cangzhou tuoming machine co.,ltd

Contact Person: Mr. zhang

Tel: 008618232715995

Fax: 0086-182-327-15995

Send your inquiry directly to us
Best Products
Other Products